Horizontal Stabilizer – 1

The past two weeks I’ve been working on the last few details before I start building. I spent a couple of days making one more table that I should be finishing soon. I also built a small one to install my drill press and grinder.

IMG_6371.jpg
Working on building one more table

Regarding tools the idea is to get a basic kit from Cleaveland Aircraft Tool and keep adding more as needed. I’ve been looking around to buy some of the more expensive tools used, and already have a list of what I may add in the near future.

Having the parts home and not being ready to work on them has been a little bit hard :). That’s why at least some preparation has been going on. I started to prepare the front and rear spars, duoblers and ribs. I also fabricated the HS-908L&R. Not a lot, but enough to keep me exited.

Time Tracker:

Time Invested: 5.2 Hrs

Total Time: 8.5 Hrs