Horizontal Stabilizer – 2

After looking at VAF Classifieds for weeks I found two of the tools that I considered a must have: DRDT-2 and Main Squeeze model 22. The first one required a quick trip to Middland, TX, and was quite an adventure to take it to Dallas. The second one was a cool find that a gentleman was selling in South Texas. For everything else I needed to start I gave the awesome people at cleaveland aircraft tools a call, and they customized a kit for me. At the end I basically got everything they offer in their get me started kit, plus some aditions and substitutions I deemed appropiate after taking the fundamentals class at synergyair.

Because I took the time to prepare the ribs, spars, doublers and also build the shims and angles I needed I was ready to start assembling the horizontal stabilizer. The first steps of instructions went pretty fast.  I match drilled the structure, and now I’m at the point in which I need to disasamble, debur and get ready to match drill the skins.