Rudder – 1

I started working on the rudder right after finishing the HS. It has been pretty straight forward until now. The first step was to trim and prepare the stiffeners. It is pretty awesome to see how the pre-punched holes only align in a specific way. It makes it really easy to get it right even for me:). Back riveting is the easiest way of getting good results no doubt about it!.

Once I had both skins ready I started to work on the structure. It took me a little bit of time to totally understand how the bottom part of the rudder goes together. Once I got it, preparation is basically the same that I’ve been doing on previous parts.

I’m done to the point where I have to start riveting the trailing edge. I bonded it with T-88 epoxy as mentioned on the instructions. I’ve been waiting for it to cure a couple of days, while I also order some rivets and an extra bucking bar to reach some pretty tight places near the trailing edge.

Last Friday I met another builder, Paul, who came from Cleburne, TX to check on my project. We had a pretty cool conversation sharing ideas and experiences. I hope to be down there visiting him pretty soon. If you want to check his work, he has a pretty cool builders blog here!.

Horizontal Stabilizer – 4

As I wrote in an earlier post, I wasn’t happy with how the horizontal stabilizer was coming along. I decided to re-order some parts and start again. I ended ordering one skin, front spars, doubler, front ribs and three main ribs. Shipping ended being the expensive part, but to be honest it was a good idea.

It took me a couple of weeks to get back to where I was when I decided to stop, but once I got all the parts prepared and primed it was actually pretty straight forward.

Learning to use the rivet gun is what takes the longest. I feel confident now that I can get decent results with it. There are a couple of things that I feel can be better, but the overall assembly came up good.

IMG_6948.jpg

Vertical Stabilizer

I kept working on my horizontal stabilizer for a while after my last post. The work I did was OK, but I kept getting the feeling that I could do better. Past Sunday I woke up and decided to just order the couple of parts I needed to re-do what I did not like.

While I waited for those parts to arrive I started to work on the vertical stabilizer. I read many times that this is actually a better sub-assembly to start with, and I have to say that I totally agree. It took a lot less time to complete. The VS is a pretty simple to assemble part. I matchdrilled, deburred, dimpled and primed in the same way that I did in the past.

The hardest part for me is definitely using the rivet gun. I managed to only put a couple of small smileys o the skin (but I still feel disappointed about it, even though everybody says that is normal). I’m thinking about getting a 2X gun to complement the 3X I have to test if the results are better.

Priming the parts this time went a little bit better after I got a new gun with the right size nozzle. There is still room for improvement, and definitely I’ll need to build a paint booth to help with the mess.

I’ve been using the Stewart Systems Ekoprime Primer. I really like that is not hard to deal with it as it is a water based primer. I’m sure some other products may offer better protection, but I do think that what I’m getting is enough for this project.

Next I’m planning an redoing the couple of parts in my HS and finish it. After that I think the rudder may come next.

Horizontal Stabilizer -3

After assembling and match drilling everything the steps called for dimpling the ribs and skins. I decided to use the main squezer to dimple the ribs in the same way we did back in December when we attendend the Synergy Air class. It was actually pretty straight foward and the results were as expected.

Once I started to dimple the skins, I was getting less than ideal results. After reading the DRDT-2 manual a couple more times, and running some searches on VAF, I came to the conclusion that I had the wrong setup. My holes were under dimpled, adding a little bit of pre-load fixed the issue. After re-dimpling the holes the results were pretty good and consistent.

Machine countersinking the spars and doublers was pretty easy. Just a matter of seting the stops to the right depth, and slowly making my way through every hole. I’ll probably need to add an extra battery for my drill or get anoter one.

 

 

Horizontal Stabilizer – 2

After looking at VAF Classifieds for weeks I found two of the tools that I considered a must have: DRDT-2 and Main Squeeze model 22. The first one required a quick trip to Middland, TX, and was quite an adventure to take it to Dallas. The second one was a cool find that a gentleman was selling in South Texas. For everything else I needed to start I gave the awesome people at cleaveland aircraft tools a call, and they customized a kit for me. At the end I basically got everything they offer in their get me started kit, plus some aditions and substitutions I deemed appropiate after taking the fundamentals class at synergyair.

Because I took the time to prepare the ribs, spars, doublers and also build the shims and angles I needed I was ready to start assembling the horizontal stabilizer. The first steps of instructions went pretty fast.  I match drilled the structure, and now I’m at the point in which I need to disasamble, debur and get ready to match drill the skins.

Horizontal Stabilizer – 1

The past two weeks I’ve been working on the last few details before I start building. I spent a couple of days making one more table that I should be finishing soon. I also built a small one to install my drill press and grinder.

IMG_6371.jpg
Working on building one more table

Regarding tools the idea is to get a basic kit from Cleaveland Aircraft Tool and keep adding more as needed. I’ve been looking around to buy some of the more expensive tools used, and already have a list of what I may add in the near future.

Having the parts home and not being ready to work on them has been a little bit hard :). That’s why at least some preparation has been going on. I started to prepare the front and rear spars, duoblers and ribs. I also fabricated the HS-908L&R. Not a lot, but enough to keep me exited.

Time Tracker:

Time Invested: 5.2 Hrs

Total Time: 8.5 Hrs