Horizontal Stabilizer – 2

After looking at VAF Classifieds for weeks I found two of the tools that I considered a must have: DRDT-2 and Main Squeeze model 22. The first one required a quick trip to Middland, TX, and was quite an adventure to take it to Dallas. The second one was a cool find that a gentleman was selling in South Texas. For everything else I needed to start I gave the awesome people at cleaveland aircraft tools a call, and they customized a kit for me. At the end I basically got everything they offer in their get me started kit, plus some aditions and substitutions I deemed appropiate after taking the fundamentals class at synergyair.

Because I took the time to prepare the ribs, spars, doublers and also build the shims and angles I needed I was ready to start assembling the horizontal stabilizer. The first steps of instructions went pretty fast.  I match drilled the structure, and now I’m at the point in which I need to disasamble, debur and get ready to match drill the skins.

Horizontal Stabilizer – 1

The past two weeks I’ve been working on the last few details before I start building. I spent a couple of days making one more table that I should be finishing soon. I also built a small one to install my drill press and grinder.

IMG_6371.jpg
Working on building one more table

Regarding tools the idea is to get a basic kit from Cleaveland Aircraft Tool and keep adding more as needed. I’ve been looking around to buy some of the more expensive tools used, and already have a list of what I may add in the near future.

Having the parts home and not being ready to work on them has been a little bit hard :). That’s why at least some preparation has been going on. I started to prepare the front and rear spars, duoblers and ribs. I also fabricated the HS-908L&R. Not a lot, but enough to keep me exited.

Time Tracker:

Time Invested: 5.2 Hrs

Total Time: 8.5 Hrs